MikeMcNair 0 Posted September 26, 2011 So, after the funeral on TUES from a friend who blew his face off, I buried another young friend today! That's two in a week! Plus, while working on a watch I stabbed myself in my left index finger, and havent been able to move it since. So (the reason for this thread in the general area) PLEASE bear with me! I am still working on watches, just a little slower doing it with ONE HAND! I SHOULD have my queue cleared up in the next 3-4 days, and I promise all will be happy, but you must know I aam working as fast as I can. I give out my email and cell # to ensure that people have a dirert link to me, and I will NOT change that. All I ask for is a little patience and understanding. There is a TON more going on that frankly is no ones business, but I'm still working, still pumping watches out, and will be sure to please every client I have!! Thank you! Michael Share this post Link to post Share on other sites
wat44 0 Posted September 26, 2011 your communication is second to no one! Share this post Link to post Share on other sites
jdoe 0 Posted September 26, 2011 Stop posting while you drive, or the postings will stop you. Take care and slow down, and raise those prices (on the other guys) Share this post Link to post Share on other sites
Cynikal.Mindset 1 Posted September 26, 2011 I've stabbed myself too with a sharp tiny flatblade screw driver...wasn't pleasant thats for sure. Share this post Link to post Share on other sites
cvp3 2,103 Posted September 26, 2011 No worries Mike. Get better and then better get. Share this post Link to post Share on other sites
NCRich 13,815 Posted September 26, 2011 Get better man. Share this post Link to post Share on other sites
g.man 0 Posted September 26, 2011 I've stabbed myself too with a sharp tiny flatblade screw driver...wasn't pleasant thats for sure. I'm beginning to suspect that you're perhaps not cut out for this modding lark. regards g.man Share this post Link to post Share on other sites
Cynikal.Mindset 1 Posted September 26, 2011 I've stabbed myself too with a sharp tiny flatblade screw driver...wasn't pleasant thats for sure. I'm beginning to suspect that you're perhaps not cut out for this modding lark. regards g.man I tell myself that every time but heck there is nobody in canada to do my dirty work for me so I gotta do it myself and fuck shit up until I get it right. In the end I fix what I need to and it looks fine and works well, just getting to that point proves troublesome at times Share this post Link to post Share on other sites
NCRich 13,815 Posted September 26, 2011 I've stabbed myself too with a sharp tiny flatblade screw driver...wasn't pleasant thats for sure. I'm beginning to suspect that you're perhaps not cut out for this modding lark. regards g.man I tell myself that every time but heck there is nobody in canada to do my dirty work for me so I gotta do it myself and fuck shit up until I get it right. In the end I fix what I need to and it looks fine and works well, just getting to that point proves troublesome at times Everyone needs a hobby. You have one within a hobby. Share this post Link to post Share on other sites
SeanusMaximus 0 Posted September 26, 2011 I've stabbed myself too with a sharp tiny flatblade screw driver...wasn't pleasant thats for sure. I'm beginning to suspect that you're perhaps not cut out for this modding lark. regards g.man Share this post Link to post Share on other sites
Caliper 0 Posted September 29, 2011 Sorry to hear about your friend and your injury, hope you get well soon. Take this free time to relax man, you seem awfully stressed lately. Share this post Link to post Share on other sites
dave47 6,574 Posted September 30, 2011 A top-notch guy having a run of bad luck and sorrow. Please give Mike plenty of understanding and room, and he'll take care of you; he's a man of his word. dave So, after the funeral on TUES from a friend who blew his face off, I buried another young friend today! That's two in a week! Plus, while working on a watch I stabbed myself in my left index finger, and havent been able to move it since. So (the reason for this thread in the general area) PLEASE bear with me! I am still working on watches, just a little slower doing it with ONE HAND! I SHOULD have my queue cleared up in the next 3-4 days, and I promise all will be happy, but you must know I aam working as fast as I can. I give out my email and cell # to ensure that people have a dirert link to me, and I will NOT change that. All I ask for is a little patience and understanding. There is a TON more going on that frankly is no ones business, but I'm still working, still pumping watches out, and will be sure to please every client I have!! Thank you! Michael Share this post Link to post Share on other sites
myaz 3 Posted September 30, 2011 Take this free time to relax man, you seem awfully stressed lately. +1. Stress is a bitch, and piles on unavoidably at times. Activate that gas escape valve now and then. Share this post Link to post Share on other sites